ARTIFICIAL PRODUCTION SYSTEMS

Scenarios of application of comprehensive services.

INTEGRAL PROPOSAL PETROTEC-AVANTUB-PROPESA

  • Head Inspection
  • Maintenance Procure and / or Substitution
  • Calibration
  • Fishing Work
  • Opening and Closing of Shirts
  • Tamponade and Abandonment
  • Induction
  • Procurement and operation of TF (for cleaning, cementing, well control, logging, sand blasting, TCP system, selective stimulation, grinding)
  • Speed String
  • Installation of Mechanical Pumping assisted by Flexible Pipe
  • Injection and dosage of treatments for the Assurance and improvement of production conditions
  • System Operation and Maintenance.

Information

  • It operates in adverse conditions, where other SAPs cannot operate (presence of sand, viscous fluids, deposits and encrustations, low fluid level, etc.)
  • Operation in deviated wells (up to 35 °)
  • Offers significant energy savings (greater than 40%)
  • Quick Installation (12 hrs. Avg.)
  • Fluid Treatment in joint operation with the BM.
  • Possibility of producing through TF (avoids rig change)
  • Continuous operation demonstrated for 1 year, without manifest affectation in TF.
  • Well and pump cleaning by TF.
  • Good pumping speed range (0.5 to 5 emp)
  • Option to operate 2 systems with a single power unit.
  • Large load capacity (> 60,000 lb)
  • Subsurface Pump Installation with TF equipment.
  • Ease of adjustment of operating conditions.
  • Real-time TF surface dynamometric chart arrangement.
  • Operating potential @ 4000 m (according to stress simulation)

Why the BM System with TF?

TECHNOLOGY SUCCESSFULLY TESTED ON ASSETS:

TERTIARY OIL OF THE GULF (APATG)
POZA RICA-ALTAMIRA (APPRA)
ACORN-JUJO (APBJ)

By means of Approving Reports of Technological Test endorsed by the Sub-Directorate of Technical Resources Management, through the Management of Technological Projects Management, PEP.

  • Depths: 1612, 1660, 1605, 1481, 2115, 2139, 2098 mv.
  • Pre-installation conditions:
  • Closed with possibilities or pending SAP.
  • Wells Closed by TP-TR Communication.
  • Wells with high viscosity fluids.
  • Energy Consumption: 354 – 444 KWatt-h / day (UBM = 650 KWatt-h / day)
  • Operational Reliability Indices> 97%
  • Incremental Expenses: 23.85, 52, 31, 43 and 158 bpd
  • Pumping Speeds: 0.5-5 epm
  • Stroke: 240 ”
  • Production by TF 1 ½ “
  • Additive Injection by TF

INTEGRAL PROPOSAL PETROTEC-AVANTUB-PROPESA

  • Head Inspection
  • Maintenance Procurement and / or Substitution
  • Calibration
  • Fishing Work
  • Opening and Closing of Shirts
  • Tamponade and Abandonment
  • Induction
  • Procurement and operation of TF (for cleaning, cementing, well control, logging, sand blasting, TCP system, selective stimulation, grinding)
  • Speed ​​String
  • Installation of Mechanical Pumping assisted by Flexible Pipe
  • Injection and dosage of treatments for the Assurance and improvement of production conditions
  • System Operation and Maintenance.

POSSIBLE UNIVERSE OF OPERATIONS AND SERVICES

  • Head Inspection
  • Testing and Maintenance
  • Procurement and / or replacement of Valves and / or Tree
  • Calibration
  • Fishing Work
  • Opening and Closing of Shirts
  • Buffering and Abandonment
  • Induction
  • Procurement and operation of TF (for cleaning, cementing, well control, logging, sand blasting, TCP system, selective stimulation, grinding)
  • Speed ​​String
  • Installation of Mechanical Pumping assisted by Flexible Pipe
  • Injection and dosage of treatments for the Assurance and improvement of production conditions
  • System Operation and Maintenance

SCENARIOS OF ANALYSIS

Below are the application scenarios of the comprehensive services that, by way of example and not limitation, are intended to show the potential benefits of their implementation. They are analysis exercises to envision the possible cash flows generated by various applications.

The certainty of the real scenarios will be a function of the documentary information and the characterization of the areas susceptible to implementation. For this reason, the recommended application conditions are also set out.

Detail of the Analysis Services

Repair or change

1 to 2 valves

Visual inspection and pressure monitoring

Cleaning and conditioning the rear well

“Preventive Maintenance” Production shaft valve lubrication

Hydrostatic tests to the production tree.

Screw in and out of flange hardware.

2 1/16 ”5M gate valve supply, and R-24 metal ring

2 1/16 ”5M Flanges and 7/8” x 6 ½ ”B7 2H Studs

Installation or removal of VR plug with pressure control equipment.

Installation or Recovery of type “H” back pressure valve

PETROTEC

Well Calibration with TF

Procurement and operation of TF for Well cleaning service

AVANTUB

Installation of Mechanical Pumping assisted by Flexible Pipe

Injection and dosage of treatments for the Assurance and improvement of production conditions. Dosage of 100 lt / day of flow improver.

Operation and Maintenance of the BM c / TF System.

Leave a Reply

Your email address will not be published. Required fields are marked *